How much does an architect cost in the UK?

What an architect's fee is built from, and what it actually buys.

People ask this question expecting a single number, and there is not one. An architect's fee follows the work, and the work follows the project, so the honest answer begins with how a fee is built rather than what it comes to.

There are three common ways an architect charges. The first is a percentage of the construction cost. The second is a fixed fee, agreed once the scope is clear. The third is a time charge, an hourly or daily rate, usually kept for early or open-ended work. Many practices use more than one: a time charge or a small fixed fee at the start, then a percentage once the budget is known.

As a rough guide, architects' fees in the UK fall somewhere between 3 and 15 percent of the construction cost. For one-off residential work they tend to sit in the upper part of that band, often around 10 to 14 percent. The smaller and more bespoke the project, the higher the percentage, because the design does not shrink in proportion to the budget. A modest, carefully detailed house can take as much thought as a large plain one. The percentage is worked out on the build cost alone, not on the land, the other fees, or VAT.

On a fixed-fee basis, and in London in particular, full-service residential fees commonly run from a few thousand pounds for a small project into the tens of thousands for a complete house. London rates sit above the rest of the country, in line with the cost of running a practice there. Since the RIBA abolished its mandatory fee scale in 2009, every practice sets its own rates, which is why two quotes for the same house can differ widely. Read what each fee includes before you set one against another.

You do not pay the whole fee at once, and you do not have to engage an architect for the whole job. The work is divided into RIBA stages, and the fee is divided with it. As a rough split, taking a design through planning is around 30 percent of the fee, the technical drawings for building regulations around 40 percent, and the construction stage the final 30. You can stop after planning and reach site another way, though you lose the architect's eye over the part of the job where most of the money is spent.

What pushes a fee up is rarely vanity. It is bespoke design, a difficult or sloping site, a listed building or a conservation area, a high specification, and full service rather than partial. What a fee buys, at its best, is decisions made early, while they are still cheap to make and expensive to miss. The drawings cost a fraction of the bricks. A week spent on a plan can save a season on site.

So the more useful question is not how much an architect costs, but what the fee is for. It is for the difference between a house that is merely built and one that is worth building, and that difference is settled long before anyone breaks ground.

A close junction of oiled timber meeting board-marked concrete, detailed with care.
A detail at Hollow Water, where decisions made on paper are settled in the building. Photograph by Johan Dehlin.

More from the Journal

All writing →